Engineering decoration sequence

1. Design and implementation of various decoration procedures to the property.

2. Enter the site for construction, enter the site for demolition, and then clear the site.

Purchase materials: purchase electric wires, switches, sockets, and pipes; purchase ceramic tiles, sanitary ware, stone, cabinets, and lay a good foundation for kitchen and bathroom construction.

3. Confess on the spot, stake out, determine the direction of power wires and CATV, communication and security lines; determine the number of switch sockets; determine the direction of water supply and drainage pipes; determine the elevation and position of cabinets, cooking tables, baths, etc.; doors, Window benchmark testing and correction, etc.

4. The pre-construction of water and electricity shall be carried out after setting out, and the hidden engineering experience shall be closed after receiving. The masonry kitchen and bathroom are covered with wall tiles.

5. Purchase all kinds of wood, plates, panels, hardware and other materials

6. Carpentry construction, hydropower and electricians will continue to install hydropower, and some hardware will enter the site.

7. For the first floor of the floor, the first construction of the carpentry on site was completed.

8. Increase and decrease, mid-term acceptance of the project.

9. Purchase paints and coatings, oil workers enter the construction site, joint construction on site and outsourcing factories.

10. Floor paving, sanitary ware installation, heating installation

11. Hardware, equipment entering the field, installing lamps.
  • 在线咨询二维码